Order Process

How Does a Full Turnkey PCB Assembly Work?

Stage 1: Communication

let us know and we’ll work with you to make them perfect.Learn more for our PCB solution design services.

For a quick and good quotation, We need the following information:

1. Gerber file (RS-274-X, or RS-274-D format), it should include following:
  • Trace layer, Aperature/D code file, NC Excellon Drill File, Drill Tool list (if not listed in NC Drill file), Soldermask, Silkscreen, Readme.txt file
  •  We can also accept other file, such as .PCB, PCBDOC, BRD, CAM, CAD, ODB++(.tgz), ASC and DXF.
2. Quantity (prototype, volume production)
3. Lead time requirements
For PCBA, please also provide:
1. BOM (.xls, .xlsx)
2. Pick & place file (.xls, .xlsx, .txt, csv)

* We can sign Non-Disclosure Agreement(NDA) with you to ensure the safety of your project.

Stage 2: Review and Quote

We provide free PCB file checks to make sure there are no missing components or incorrect construction, and check that these file designs are within the capabilities of our production process.

Our engineers issue a DFM report for your reference, and our team of manufacturing experts provides recommendations to help optimize your order for procurement.

Prototype(<1m²) Layers Normal Service Expedited Service
FR4 PCB
1 Layer
3 – 4 days
24 hours
2 Layers
4 – 6 days
24 hours
4 Layers
8 -10 days
48 hours
6 Layers
8 – 10 days
72 hours
8 Layers
10~14 days
72 – 96 hours
10 Layers
14-18 days
120 – 168 hours
HDI (1+N+1 2+N+2)
2.5 – 3.5 weeks
TBD
Prototype(<1m²)LayersNormal ServiceExpedited Service
Metal Core PCB
1 Layer
1 – 1.5 weeks
48 hours
2 Layers
2.5 – 3 weeks
168 hours
4 Layers
3 – 4 weeks
1.5 weeks
6 Layers
4 – 5 weeks
2 weeks
8 Layers
5 – 6 weeks
TBD
10 Layers
6 – 7 weeks
TBD
Prototype(<1m²)LayersNormal ServiceExpedited Service
Ceramic PCB
1 Layer

Thick Film:3 – 3.5weeks

DCB/DBC/AMB: 3 – 4 weeks

DPC: 2 – 3 weeks

Thick Film:1.5weeks

DCB/DBC/AMB: 2 – 3 weeks

DPC: 1.5 weeks

2 Layers

Thick Film:3 – 4 weeks

DCB/DBC/AMB: 3.5 – 4.5 weeks

DPC: 2.5 – 3.5 weeks

Thick Film:2 weeks

DCB/DBC/AMB: 2.5 – 3.5 weeks

DPC: 2 weeks

4 Layers
Thick Film: 4 – 6 weeks
2.5 weeks
6 Layers
Thick Film: 4.5 – 6 weeks
2.5 weeks
8 Layers
Thick Film: 5 -7 weeks
3 weeks
10 Layers
Thick Film: 6 – 8 weeks
3.5 – 4 weeks
Prototype(<1m²)LayersNormal ServiceExpedited Service
Flexible PCB
1 Layer
0.5 – 1 week
48 hours
2 Layers
0.5 – 1 week
48 hours
3 Layers
1.5 – 2 weeks
72 hours
4 Layers
2.5 – 3 weeks
96 hours
6 Layers
3 – 4 weeks
120 hours
8 – 12 Layers
4 – 5 weeks
144 hours
Prototype(<1m²)LayersNormal ServiceExpedited Service
Rigid-flex PCB
2 Layers
1.5 – 2 weeks
5 days
3 Layers
2 – 2.5 weeks
6 days
4 Layers
2.5 – 3.5 weeks
1 week
6 Layers
3.5 – 4 weeks
1.5 weeks
8 – 12 Layers
4 – 5 weeks
2 weeks

Step 3: PCB Prototype

Even if your new design has passed review,we still strongly recommend doing a small amount of prototyping to verify your circuit design and manufacturability before bulky production.It enables the reduction of the risk of costly rework during mass production.

We proceed with the PCB/PCBA prototype order first, send it to you for approval, and provide feedback on the prototype run to ensure smooth batch production.

Step 4: PCB Manufacturing

Once the prototypes are verified, we move forward to the production stage after obtaining the customer’s permission.

We prepare all necessary materials for assembly during PCB production, so assembly can begin immediately after completing the PCB fabrication.
All the boards undergo 100% inspection and E-test. We offer quality reports for your reexamination.

Production Layers Normal Service Expedited Service
FR4 PCB
1 Layer
4-6 days
2-3 days
2 Layers
5-8 days
2-3 days
4Layers
8-12 days
3-5 days
6 Layers
8-12 days
4-6 days
8 Layers
12-16 days
6-8 days
10 Layers
18-20 days
TBD
HDI(1+N+1,2+N+2)
3-4 weeks
TBD
Mass ProductionLayersNormal ServiceExpedited Service
Metal Core PCB
1 Layer
2 – 2.5 weeks
1 week
2 Layers
3 – 4 weeks
1.5 – 2 weeks
4 Layers
4 – 5 weeks
2 weeks
6 Layers
5 – 6 weeks
2.5 weeks
8 Layers
6 – 7 weeks
3 – 4 weeks
10 Layers
7 – 8 weeks
TBD
ProductionLayersNormal ServiceExpedited service
Ceramic PCB
1 Layer

Thick Film:3.5 – 4 weeks

DCB/DBC/AMB: 4 – 5 weeks

DPC: 4 – 5 weeks

Thick Film:1.5 – 2.5 weeks

DCB/DBC/AMB: 2.5 – 3.5 weeks

DPC: 2 – 3 weeks

2 Layers

Thick Film:4.5 – 5.5 weeks

DCB/DBC/AMB: 5 – 6 weeks

DPC: 5 – 6 weeks

Thick Film:2 – 3 weeks

DCB/DBC/AMB: 3 – 4 weeks

DPC: 2.5 – 3.5 weeks

4 Layers
Thick Film: 5 -6 weeks
2.5 – 3 weeks
6 Layers
Thick Film: 5 -6 weeks
3 – 3.5 weeks
8 Layers
Thick Film: 6 -7 weeks
3 – 4 weeks
10 Layers
Thick Film: 7 – 9 weeks
4 – 5 weeks
Mass ProductionLayersNormal ServiceExpedited Service
Flexible PCB
1 Layer
1.5 – 2 weeks
1 week
2 Layers
2 – 2.5 weeks
1 week
3 Layers
2.5 – 3 weeks
1.5 weeks
4 Layers
3 – 4 weeks
1.5 weeks
6 Layers
4 – 5 weeks
1.5 – 2 weeks
8 – 12 Layers
5 – 7 weeks
2 – 3 weeks
Mass ProductionLayersNormal ServiceExpedited Service
Rigid-flex PCB
2 Layers
2.5 – 3.5 weeks
1.5 weeks
3 Layers
3 – 4 weeks
2 weeks
4 Layers
4 – 5 weeks
2.5 weeks
6 Layers
5 – 6 weeks
3 weeks
8 – 12 Layers
6 – 8 weeks
3.5 weeks

Step 5: PCB Assembly

We offer consignment, full turnkey and partial turnkey assembly services.

We source all the parts directly from the manufacturers or from authorized distributors to avoid counterfeit parts.

Standard leads times range from 7-15 days. If BOM purchased by us, and the parts are not in stock,1 week will be added for most cases.

Learn more for our PCB assembly services.

Step 6: Inspection and Testing

We strictly follow the international standards and customer standards to inspect and control the delivery quality.

We have developed a fully controlled in-house quality test process to assure the quality of the products we deliver.

Step 7: Packing & Shipping

Packaging: Packaging usually involves sealing the material around the printed circuit board to keep dust, moisture and other foreign objects out. All our PCB boards are shipped in vacuum packages. All our PCBA boards are shipped with anti-static packaging and Shock-proof packaging.

Transportation time: You can choose among various shipping methods and have the products delivered at any destination all around the world. Follows are some Standard Shipping Times for your reference.

Step 8: After-sale Service

Delivery is not the end,just the beginning of next cooperation.

We timely follow up the quality performance of the products after delivery, and take quick and effective improvement actions for the feedback of customer’s abnormal condition.

If there is any problem with your order, our team of engineers will conduct a meeting for a solution within 48 hours.

If a defect arises under normal use for a period of 90 days from date of shipment, we will re-fabricate the boards for free or make refund.

Let’s work together

We will respond to you within 12 hours. Feel free to reach out to us for:

Contact Us